Horizontal and vertical surfaces, As a chamfer band in wet areas and balconies, As a chamfer band at foundation-wall joints, As a chamfer band in terrace-parapet joints, All kinds of detail points such as around the roof chimney, around the cable-pipe outlets, joints of roof elements, junction points of metal roof coverings, around skylights, door-window wall joints, Protection and insulation of structures and structural elements exposed to temporary or continuous water pressure and leaking water, Giydirme Alüminyum kompozit ve cam cephelerin detay çözümlerinde, It is applied with a special primer (Entech BitümEnflex SB veya Entech EnBa EP Primer) on all kinds of metal roof elements.
It is easy to prepare and apply. It does not require torch or hot air source. (*It is recommended to use hot air source for overlaps if weather is below 10 oC) Adheres fully to the applied surface. Helps with detail solutions. It helps to maintain the integrity and continuity of the waterproofing at the corner points, which are the most problematic areas. It has crack bridging feature. Provides insulation without drying time after application. It can be applied on vertical and horizontal surfaces. Does not flow.
| Top Surface | :Geotextile Felt |
| Bottom Surface | Silicone Foil |
| Color | :Gray-White |
| Application Temperature Thickness | :+5° C 35° C 1,0 mm - 1,5 mm – 1,8 mm |
| Width | :Standard 10 cm, It can be produced in all sizes between 5 cm-100 cm. |
| Length | : 10 mt/roll |
Surface Preparation The application surface should be dry, clean and free from loose parts. Sharp edges on the surface should be rounded with grinding machine and corners and deep gaps should be covered with repair mortar. Internal corners, joints of walls should be chamfered. As primer on the prepared surface, Entech BitümEnflex Primer WB S /WB C / SB bitümen based primers or Entech EnBa EP Primer can be used and application should be start after primer has completely dried. The surfaces that reduce the adherence of the material should be roughened.Product Preparation It is ready to use after removal of silicone foil on the sub-surface. Application Remove silicone foil at the beginning of the membrane and press the exposed adhesive layer onto the substrate beginning from the middle. Avoid trapping air and creating creases. Pull the silicone foil through from under the roll and pull it off while unrolling the membrane. Firmly press the applied membrane onto the substrate. Overlap the membrane a minimum of 10 cm. to ensure a stable and durable seal, the adhesive part in the overlap area must be well pressed.
10 m rolls in cardboard package
Shelf life is 12 months when unopened in a sun-free environment. Product circulation must be handled carefully. Shipment should be provided with the principle of “the product which enters the stock at first is also the first one leaves the stock”.
Do not apply when it is raining or if it is likely to rain. Application should be done on the part of the structure that comes into contact with water. Attention should be paid to application temperature, application should be done in the temperature range of + 5 ° C + 35 ° C. Materil should not be exposed to traffic directly.
If the product is used out of its purpose or if the application conditions mentioned above are not complied with, Entech Yalıtım Malzemeleri Paz. San. Tic. Ltd. Şti is not responsible