Entech EnBa Epoxy Primer
It is a two-component, reaction-drying epoxy resin-based, epoxy primer with solvent which has good adhesion, curing with its polyamide hardener, highly filling, able to form a solid base for the coatings to be applied on it.

As a primer for polyurethane insulation products (such as Entech EnBa Likit - Pur W1K), As a primer before polyurea application, As a primer layer before the application of epoxy or polyurethane top coatings on concrete, cementitious or epoxy mortars, on floors subject to medium and heavy loads, As a concrete primer to wet the concrete surface and provide a good bonding bridge before epoxy mortar, self-leveling epoxy screed, epoxy laminate or epoxy/polyurethane top coat coatings, It is used as a primer before the application of polyurethane foam.

It is easy to prepare and apply. It can be sanded easily. It provides high corrosion and moisture resistance. It creates a smooth surface for all kinds of air and oven dried topcoats to be applied on it. It prepares the ground for all kinds of paint and coating materials to be applied on it.

First Drying: 1-2 Hours
Final Drying: 3-4 Hours
Second Layer Application: 6-8 Hours
Appearance: Matte and Flat
Mixing Ratio (A / B): 1st Component 1.275 Units - 2nd Component 0.225 Units
Container Life: 18-22 Hours(20 °C)
Surface Temperature: 10 °C - 20 C
Application Temperature: 10 °C - 20 °C
Consumption: 0,20 - 0,50 kg/m²

Concrete, plaster, cement residues, etc. foreign materials needs to be removed by cutting, scraping with a wire brush. Water-soluble foreign materials like salt needs to be removed with high-pressure water steam or spraying water. If surface is washed, it should be waited for a few days for moisture evacuation. Oil and grease residues are also needs to be removed by alkali or solvent washing. Sandblasting is the most effective method for removing rust. The blast cleaning degree is Sa1, Sa2, Sa2.5 and Sa3 according to Swedish standards. Cleaned surface areas should be primed immediately.

  • 5 kg set ± %2
  • 15 kg set ± %2

Shelf life is 12 months when unopened in a sun-free environment. Product circulation must be handled carefully. Shipment should be provided with the principle of “the product which enters the stock at first is also the first one leaves the stock”.

Do not apply when it is raining or if it is likely to rain. After the application, in the first 24 hours, application should be protected from frost, sun, strong wind. Attention should be paid to application temperature, application should be done in the temperature range of + 5 ° C + 35 ° C. The relative humidity of the environment should not be above 60%. Otherwise, since the exothermic chemical reaction between the two components cannot take place completely, the material will not gain resistance to chemical and physical effects. The mixture should be prepared enough to be used in one working day.

If the product is used out of its purpose or if the application conditions mentioned above are not complied with, Entech Yalıtım Malzemeleri Paz. San. Tic. Ltd. Şti is not responsible